Clicky
Country

Success of Narsingdi RHD in two years


Bangladeshpost
Published : 24 Mar 2024 09:56 PM

The communication system is one of the fundamental changes that have taken place in all areas of the country under the government's decision and guidance. And in the development of this communication system, engineers of Roads and Highway Department (RHD) have an important role in the prosperity of the country and the development of road infrastructure. 

In the continuation of that, with the aim of building durable and strong roads in Narsingdi district, the Department Narsingdi is working with efficiency and professionalism. Modern aesthetic roads are being added to the communication system as the capacity of RDH Executive Engineers increases. 

People related to the department said that since RDH Executive Engineer Md Hamidul Islam joined Narsingdi on February 08, 2022, the overall picture of the activities of the department in Narsingdi is changing. He has brought down the extra cost of various projects under his efficient leadership. Focused on increasing the scope of work. Continuing the trend of economic growth, he is playing a leading role in building balanced, sustainable and strong scenic roads. There are no hidden or unseen things. According to the comments of the concerned, efficient leadership is going on in the Narsingdi Roads and Public Paths Department. 

With clarity they said that currently the network condition of this department is much better than any time in the past.

 Narsingdi Roads and Public Roads Department is moving ahead in multi-dimensional work for road development. However, RDH Narsingdi will be able to meet the challenges existing in road construction while maintaining the quality of big projects under the efficient management of engineer Hamidul Islam.

Among the scenic roads of Shivpur-Dulalpur-Lakhpur Hatirdia District Highway, Jihastala to Shekerchar District Highway, besides Poradia Belab Road, Palash Ghorashal Tan Station Road, Ghorashal Tongi Road, Raipura Narsingdi Madanganj Road, Itakhla to CMB Bazar Road along with sustainable development. 

The image of the capacity of the Suaj Department Narsingdi has emerged through the media. Besides, there are various roads including Panchdona-Danga four-lane Drishtinandan road. 

Executive Engineer Hamidul Islam is doing regular monitoring and supervision to implement these development projects in a sustainable and robust manner. 

And in these ongoing developments, the multi-dimensional action of Souz has emerged. Since joining the Executive Engineer of Sauz, one after another operation has been carried out to evict illegal structures built on Sauz's land. 100% of the land of Sauz has been recovered.

Roads and Highway Department (RDH) Executive Engineer Md. Hamidul Islam said that the Roads and Public Ways Directorate (RDH) Narsingdi is working tirelessly to realize the dream that Bangabandhu Sheikh Mujibur Rahman dreamed of building Sonar Bangla. 

By using the roads built by RDH the public can travel to their destination in a short time without interruption, as well as transport goods easily.

 Directorate of Roads and Public Ways Narsingdi is determined to implement the new plans and projects that the government is taking for the development of the communication system.